How to prepare an as-built drawing brief

A practical checklist for owners, architects, consultants and contractors planning existing-building documentation.

Before arranging measurement, define what the drawings need to help your team do. A short, specific brief makes it easier to quote the right work and agree on useful outputs.

1. Explain the next project step

State whether the drawings will support renovation design, contractor pricing, landlord coordination, property records or an application. Identify the person who will use the files. Ask your architect or consultant for their required drawing list before booking site work.

An existing-condition record and a proposed design package answer different questions. If a project needs both, identify who is preparing the design and which background information they require.

2. Describe the building coverage

Provide the address, building type, approximate area and number of floors. List the specific areas involved: one tenant unit, a whole floor, a basement, several levels or an exterior area. Identify shared spaces and rooms that need separate access.

Do not assume that a floor-plan request includes ceiling plans, elevations, sections, roof plans or a site plan. Name each required output so it can be discussed and included in the scope.

3. Choose formats with the receiving team

  • DWG: an editable CAD background for a 2D drawing workflow. Confirm units and file version.
  • PDF: plotted sheets for reading, printing and review. Confirm the required sheets and presentation.
  • RVT: an existing-condition Revit model. Confirm the Revit version, model elements, levels and views.
  • Walkthrough link: visual site context for remote review. Confirm access settings, features and hosting duration.

If several consultants use different software, identify the exports they need. A model, a floor plan and a panoramic tour are separate outputs even when they describe the same building.

4. Gather the existing records

Attach old drawings, PDFs, CAD files, photos and sketches. Explain where they came from, when they were prepared and which areas may have changed. Include a survey if your site drawing needs to reference property information, and identify any questions about the source or its currency.

Supplied records help establish context. The scope should still state what is being measured now and what will be taken from existing information.

5. Plan access and note missing information

Identify who can open the space, whether occupants need notice and whether any areas are restricted. Describe parking, loading or access arrangements that affect the visit. For a walkthrough, remove sensitive material you do not want captured and identify areas to exclude.

Ask how inaccessible or concealed conditions will be identified. Visible documentation cannot by itself establish what is inside a closed wall or behind inaccessible equipment.

6. State the deadline and review needs

Give the actual date the receiving team needs the files and explain any landlord or application deadline. Ask about scheduling, the drawing review process and how questions or scope changes will be handled. Timing should be confirmed for your building and outputs.

A brief you can copy

Project: [address and building type]
Coverage: [area, floors and spaces]
Purpose: [who will use the files and for what]
Outputs: [drawing list, DWG/PDF/RVT versions, views or walkthrough]
Existing records: [files supplied and known changes]
Access: [contact, occupied areas and restrictions]
Target date: [date and reason]

Compare Trivion’s documentation services, review the scope FAQs, or send your brief for a project quote.

Request a quote

Send the address, approximate area, required outputs and preferred timeline. Add any available drawings or photos so we can confirm the scope.

Request a project quoteCall 647-858-5677